CASE STUDIES

Case Studies

ENGINEERING

Aker Solutions: Power Systems Analysis Study for new Subsea Power Interconnector

About the asset The two platforms covered in this study are located in the UKCS.

Case Studies

ENGINEERING

Repsol Sinopec: Helideck Lighting Supply Modifications

About the Asset The Tartan Alpha platform is located in blocks 15/16a and 14/20a and is 187 km North East of Aberdeen in 138m of water. The platform was installed in 1979 and the first oil was produced in 1981.