CASE STUDIES

Case Studies

ENGINEERING

Teekay: Foinaven FPSO, H Beam Deluge Skid Repair

About the asset The Foinaven is the first FPSO to be in the waters West of Shetland. Our client was Teekay with operating partners BP...

Case Studies

ENGINEERING

Teekay: Foinaven FPSO, Access Platform

About the asset The Foinaven is the first FPSO to be located in the waters West of Shetland. Our client was ...

Case Studies

ENGINEERING

Teekay: Foinaven FPSO, Produced Water Pipework

About the asset The Foinaven is the first FPSO to be located in the waters West of Shetland.... About the asset...

Case Studies

ENGINEERING

NOV: Mero II, Concept Design

About the asset The Mero 2 FPSO is to be located offshore Brazil. The field contains high CO2­ and H2S...

Case Studies

ENGINEERING

UCKS Operator: Power Systems Study

Read about another successfully delivered Power Systems Study delivered for a North North Sea asset.

Case Studies

ENGINEERING

Chevron: Captain ICSS Upgrade Project (CX2957) F&G Cause and Effect As-Building

About the asset The Captain field lies approximately 90 miles north-east of Aberdeen, Scotland, in the Outer Moray Firth, in water depths of around 346 feet. The field includes; the wellhead protector platform (WPPA) and bridge linked platform (BLPA) which are both connected back to a floating production, storage and offloading vessel (FPSO) as well as two subsea manifolds tied back and connected to the platforms by a suite of pipelines.