Case Studies

Repsol: Piper Bravo, Amine ReboilerUpgradekatoni_case_4.png

katoni_case4.png

 

About the asset

The Piper B platform is located in UKCS Block 15/17 and is approximately 120 miles north east of Aberdeen. Our client Repsol now operates the platform which has been in situ since 1992. 

Katoni’s role in supporting Repsol

We supported Repsol on this asset in 2018 and this commission was to identify the root cause of a noise and vibration issue associated with a water injection bypass valve during start-up.

Collaboration in action

Understanding the Repsol’s needs - The commission required a creative solution which Repsol required within a limited budget that could create an economically optimal outcome.

Delivery – We undertook root cause analysis and identified an incorrect valve type had been installed. At this stage we undertook options appraisal, selected and developed the preferred option. Through our full EPC offering we undertook vendor liaison including RFQ development and vendor proposal review and finally produced the recommended EPC solution.

The Katoni Way – To meet the aim of addressing the failure we created a low-cost solution to install a multi-stage globe valve with pressure let down capabilities to ensure safe and controlled pressure equalisation during start-up. Our solution also included multidiscipline input from our piping and structural teams.

Project delivered on time and on budget

 

News

First Scottish U12 Katoni Cup held - Jan 2018

Katoni Engineering Ltd were proud to sponsor the first U12..

News

Katoni in the News - CAP 437, The race to be second - Nov 2018

Iain MacKenzie has written a detailed review of the roll out of the recent changes to Helideck lighting systems and considers the lessons which can be learned as we look to innovate in the North-Sea

News

Katoni in the News - Expert view on CAP347 from MD - Jan 2018

John Maclean talks about the emerging impact of CAP347 changes and how it will improve safety for helicopters in the UKCS.